Diagnostic Level Duration Description
---------------- -------- ---------------------------------------------------
Level 5 3 sec Extremely quick and superficial general maintenance
scan performed by the computer.
Note: The system being tested can operate under
Yellow and Red Alert.
Level 4 5 min A little slower, more of a complete scan. Normally
used during a shift change in order to generate an
accurate report for the duty officer.
Note: The system in question is to remain
on-line during this test.
Level 3 30 min Very complete scan. This scan is used on computer
systems only.
Note: The system in question can remain
on-line during this test.
Level 2 1 hour This is a combination of computer scans which must
then be verified by an engineer. Not an exhaustive
scan and subject to errors.
Note: The system in question should be
shut down before this test can be performed.
Level 1 4 hours The most thorough check possible. Involves
systematically taking each component apart and
testing it, as well as all power couplings.
Note: The system in question must be
off-line during this test.